We were faced with the task of laying 12 km of outdoor networks in a golf club in the vicinity of Minsk. Laying outdoor networks is a complex, time-consuming and labor-intensive type of work and requires a responsible approach. Our specialists are highly qualified, and the availability of special equipment and a stock of vehicles allowed us to perform all construction and technological processes as efficiently as possible.
Types of work on outdoor networks that the Stroytegia team performed at the facility:
design;
construction of external engineering networks and utilities arrangement (water supply, sewerage K1 and K2, power supply, construction of 6 transformer substations of 10 kW, construction of sewerage for communication networks – 4,000 m²);
construction of roads and driveways – 3,200 l. m.
Minsk Golf Club has an area of more than 70 hectares, which includes:
Championship 18-hole golf course of international class (par 72);
Academic 9-hole golf course (par 27);
Training golf course (2 driving ranges, 2 putting greens, chipping green